An Argentinian customer arranged an inspection of our manufaturing site
2025-02-12 12:19:36
hj2008mt
An Argentinian customer arranged an inspection of our manufaturing site
Customer wanted to check our factory before placing an order. So they arranged an inspection done by the third party.
Below is the result: Passed
- Fatal mistakes in IPX9K waterproof test: nozzle size and water temperature control, the truth you must know
- Neutral Electrode Temperature-rise Tester: Ensuring Safety in Electrosurgery
- What are the key differences between ISO 80369-7 and ISO 594?
- ISO 80369-7 Luer Gauge Checklist
- KINGPO 2024 R&D Results Report
- ISO 594 is replaced with ISO 80369
- KingPo CEO invited to the 83rd International Electrotechnical Commission (IEC) General Assembly
- ISO 80369-7:2016 Connectors with 6% (Luer) taper for intravascular or hypodermic applications What is the ISO 80369-7 standard? What happened to ISO 594-1 and ISO 594-2?
- Saudi Arabian Customer Purchase ISO 80369-7 reference connector and ISO 80369-20 test apparatus from us
- Luer Gauge Adapter for Syringes: Enhancing Medical Precision and Safety