An Argentinian customer arranged an inspection of our manufaturing site
2025-02-12 12:19:36
hj2008mt
An Argentinian customer arranged an inspection of our manufaturing site
Customer wanted to check our factory before placing an order. So they arranged an inspection done by the third party.
Below is the result: Passed


- Is defibrillation protection testing done correctly?
- Fatal mistakes in IPX9K waterproof test: nozzle size and water temperature control, the truth you must know
- ISO 80369-7 Luer Gauge Checklist
- KINGPO 2024 R&D Results Report
- ISO 594 is replaced with ISO 80369
- ISO 80369-7:2016 Connectors with 6% (Luer) taper for intravascular or hypodermic applications What is the ISO 80369-7 standard? What happened to ISO 594-1 and ISO 594-2?
- Saudi Arabian Customer Purchase ISO 80369-7 reference connector and ISO 80369-20 test apparatus from us
- Understanding ASTM F2059 Fluid Flow Test: A Comprehensive Overview
- Essential Considerations for Small-Bore Connector Testing Equipment
- Medical Device Pressure Validation: Ensuring Accuracy and Reliability